WPCP
A Water Pollution Control Program (WPCP) may be required if the total disturbed area of the project site is less than one acre. Typically, Caltrans or a local agency’s grading ordinance requires small projects to implement a WPCP or BMP Action Plan.
We will provide a proposal that includes a fixed fee budget to prepare a WPCP that includes:
- Evaluate your site based on plans or a site visit.
- Prepare a water pollution control drawing that describes cost-effective BMPs.
- Prepare the WPCP per the agency’s requirements (e.g., CALTRANS template).
- Provide on-going support with amendments to the WPCP throughout construction.
We can also provide QSP site inspections and reporting for your project.